I-94 Project
Why is the Greenways Coalition involved in a freeway project? Freeways in Detroit have disconnected neighborhoods across the city for those on foot or bike. They disconnect them for motor vehicles, too, which funnels all traffic to use high-stress bridges (e.g. Forest and Warren over the Lodge or Mt. Elliott and Conner over I-94.) While Detroit freeways have pedestrian bridges, they are often poorly maintained and have ramps that dump you onto the service drive with speeding motorists.
The I-94 project in Detroit is one attempt to make improvements. We didn’t like the early designs and starting raising issues a decade ago. With the city’s actions, MDOT has proposed major design changes. Key bridges we bike and walk over will no longer be permanently removed — and they’ll be improved. Those pedestrian bridges will be converted to Complete Streets with wide sidewalks, bike lanes, and no ramps. They’re will be fewer new service drives.
One major highlight is the new Iron Belle Trail/Conner Creek Greenway trail segment and bridge over I-94. This provides a safer alternative to the busy (and getting busier thanks to FCA) Conner Avenue.
We’ve written more about this update on our web site with links to MDOT’s Draft Supplemental Environmental Impact Statement or DSEIS.
Though not part of the DSEIS, the Second Avenue bridge over I-94 is getting rebuilt next year and it will be a major improvement for non-motorized users. The Cass bridge will be replaced in 2021. The entire project won’t be done until about 2036, so stay healthy in order to be around for the grand opening.
Joe Louis Greenway
The City of Detroit has wrapped up a second round of public meetings for the greenway. This time the conversations dove into more details regarding design, affordable housing, economic development, and more.
One of the biggest changes has been the greenway’s routing in Southwest Detroit. We had originally proposed that the greenway follow W. Vernor since it already had bike lanes and was part of the Southwest Detroit Greenlink. However, the current bike lanes are not ideal and certainly not family friendly. The road is not wide enough for other designs that would preserve the well-used vehicle parking. So, the city is routing the greenway further south and using W. Jefferson. This change connects more points of interest, including the recently renovated Riverside Park, Fort Wayne, the Gordie Howe International Bridge, Woodmere, and Patton Park.
The Framework Plan is expected to be completed by February.
History of Greenways in Detroit
We worked with Gwen Gell from the Taubman College of Architecture and Urban Planning at the University of Michigan who created this amazing report: The Legacy of Bicycles in Detroit Michigan: A look at greenways through time.
Detroit’s automotive heritage casts a heavy shadow over its trails and bicycling history. This report helps shine a light on the latter.
As summary of it with the graphic timeline is now on our web site. There’s also a link to the full PDF version.
Other News
- Atwater Beach/Valade Park construction continues on the RiverWalk. There’s no announced opening date as of yet but we expect it to be in late October.
- Spirit Plaza is under construction as it receive an $800,000 upgrade after Council voted to make it permanent.
- The city’s numerous Complete Streets projects are under construction as well, including Jos Campau (part of the Jos Campau greenway), Bagley Street (part of the Iron Belle Trail), and Livernois (part of the Joe Louis Greenway.) These are major reconstruction projects that are affecting local businesses along them. Please consider supporting these businesses.
- We recently biked over to Windsor (using the Tunnel Bus bike racks!) to present at the Trans-Canada Trail – Ontario annual meeting. They were very interested in learning what is happening with Detroit and Michigan trails now that we will eventually be connected via the Gordie Howe International Bridge. There is a great deal of interest in how we promote trail tourism on both sides of the border.
- We were recently featured on the Beaumont Housecall podcast with Dr. Asha Shajahan. We talked about biking, trails, health and much more.
- We continue to be involved in the electric scooter discussion, including this recent Bridge article, E-scooters are fast, unregulated and all over Detroit. What could go wrong? We think scooters are another good reason to have a protected bike lane network in Detroit.
Upcoming October Events
- Conant Streetscape Project community meeting, October 2nd 5:30pm at the Lasky Recreational Center, 13200 Fenelon Street. More details
- Free Bikes 4 Kidz is looking for donated used bikes for Detroit youth. The big donation day is Saturday, October 5th from 9am to 2pm at 22 Henry Ford Health System locations across Metro Detroit. They are also seeking volunteers. Please help make this program even more successful than last year’s.
- There isn’t an Open Streets in Detroit this year, but Dearborn is hosting their first! It’s Sunday, October 6th from 11am to 3pm. More details
- Two community workshops are planned for Corktown on October 9th and 10th. They are focused on transportation, including parking, streetscapes, circulation (e.g. 1 & 2-way traffic), and mobility. These workshops are also in partnership with the Michigan Department of Transportation (MDOT) who is kicking off a Michigan Avenue Planning & Environmental Linkages Study. This 16-month MDOT study will “formalize a future” for Michigan Ave., from Campus Martius to I-96/75 interchange.
- Lastly, the Michigan Trails and Greenways Alliance is having their Annual Meeting on October 19th at Belle Isle. It’s a free event but you must register. As part of the event, we are leading a short bike tour at 10am, but there’s also a paddle trip and history walk.
For the most recent news, follow us on Twitter and Facebook