Categories
Greenways Newsletter Safety & Education

News from the Trail – March 2020

Well that’s not how we expected spring to start! With the weather starting to warm up, we’re all  making plans for group rides, runs, and races. The Coronavirus has put the season on hold. Of course the top priority is for everyone to remain physically and mentally healthy — and that still includes riding, walking, and running while practicing safe social distancing.

The City of Detroit has issued this update on their parks:

To reduce the spread of COVID-19, the City of Detroit has closed all of its recreation centers through April 5, 2020. Park facilities such as clubhouses, community centers, and public restrooms will also remain closed during this time.

Recent evidence suggests that the COVID-19 virus can live for several days on surfaces such as playgrounds and other “high touch” areas in public spaces. For this reason, please refrain from using playgrounds or other park amenities, and instead focus on taking long walks or bike rides, practicing social distancing of at least 6 feet from other individuals.

The Michigan Department of Natural Resources (DNR) also announced the motor vehicles can now access Belle Isle and other state parks without a Recreation Passport during the COVID-19 situation. Note that restroom buildings will are closed. The DNR notes:

We know there’s been a steady stream of “closure” information and messaging about self-isolating to slow the spread of COVID-19. It’s true, we are in uncharted territory, and such steps are critical in protecting Michigan residents from coronavirus risk. Safeguarding mental health is just as important, and spending time outdoors – whether in your backyard, on your balcony or in big, open spaces – can boost mind, body and spirit.


Cancelled and postponed events

The Green Task Force Earth Day Celebration scheduled for April 18th has been cancelled. On a related note, we are taking a larger role in the Detroit City Council’s Green Task Force. We are now co-chairing a new Transportation and Mobility Subcommittee that meets the third Tuesday of each month at 4 PM. Everyone is welcomed to attend.

Our Detroit Bike to Work Day will be pushed back to June. We’re also taking this opportunity to modify the event and broaden its scope to be more than just about getting to work. It’ll be more about biking for transportation, for health, and for sustainability. We look forward to sharing more event updates soon.

We are still planning our Joe Louis Greenway Fundraiser Ride for June 21st. The starting location and route will be updated this year to take advantage of the city’s new greenway routing. Save the date and we’ll let everyone know when the registration opens.


APBP Michigan Webinar Series

The Association of Pedestrian and Bicyclist Planners (APBP) offers monthly webinars on a variety of topics. We find them an invaluable resource for staying on top of the rapidly changing bike/pedestrian environment. Individuals can pay for individual webinar access through the APBP website ($50 members & $85 non-members).

Now, thanks to APBP and the Michigan Chapter, there is a free option. The Detroit Greenways Coalition and SEMCOG are co-hosting the webinars in Detroit at the SEMCOG offices (1001 Woodward Avenue, Suite 1400.

We have a list of the 2020 webinars on our website and APBP has more details on theirs.

Webinars are from 3 pm to 4 pm. More information on each webinar is available on this APBP webpage.

APBP has applied to the AICP for 1.0 Certification Maintenance credits for these webinars.


Thanks, Ashok Patel!

Bike to Work Day 2018 - Ashok Patel, Prasad Nannapaneni, Janet AttarianThere are many City of Detroit staff that are making this city a better place to bike, walk, and run. One of those staff members recently retired: Ashok Patel, who led the Traffic Engineering Division of the Department of Public Works. We first worked with Mr. Patel to help get the Corktown bike lanes approved. He worked with us and MDOT to bring a road design workshop to the city which led to another citywide investment in bike lanes. His contribution to this progress has been significant!

A Detroit City Council Testimonial Resolution also mentions that he “encourages all of the employees in the Traffic Engineering Division to bike.” This has been helpful because it has given the engineers a wider perspective on how road design affects all users.

Congratulations on your retirement, Mr. Patel, and we’ll look forward to seeing you out on the bike.


Other updates

  • The City of Detroit is planting 10,000 trees across the city. If you want one planted in front of your home between the sidewalk and street, call 313 224-6391 or email squalisa@detroitmi.gov. Did you know street trees are one way to reduce speeding vehicles on residential streets? They also help reduce stormwater runoff.
  • The RiverWalk between Cullen Plaza and GM Plaza has reopened. You may recall an errant boat was driven into the RiverWalk last year and caused major damage to the railing. The Detroit Riverfront Conservancy has completed the repair.
  • The Conservancy is also seeking seasonal and trull time support for park operations. The application deadline is March 25th.
Categories
Greenways Newsletter

News from the Trail – February 2020

W. McNichols to get bike lanes this year

Mayor Mike Duggan led a community meeting to discuss four streetscape options for W. McNichols just west of Livernois. One option included bike lanes. Despite concerns from business owners about losing some onstreet parking, the community voted 39 to 12 for the bike lanes.

We wrote more about this in our article, The Community decides on Complete Streets.

We’ve heard it asked at other public meeting, “Why is the city building bike lanes?” and “Who is asking for them?”. In this case it Detroiters from the area. Construction is expected to be completed this year.


2020 Snapshot

We created our first infographic that highlights Detroit’s progress towards a more bikeable and walkable city — as well as our role in making that happen.

What do you think? Is there additional data we should try to capture and benchmark?

We do have plans to collect more relevant data and make it available via our website. Look for some exciting announcements this spring.


SEMCOG seeks public comment

Southeast Michigan Council of Governments (SEMCOG) has released a draft Bicycle and Pedestrian Mobility Plan for Southeast Michigan. According to SEMCOG, the plan “ensures that the region’s nonmotorized system meets the transportation, quality of life, health, and accessibility needs of its residents and visitors, as well as the economic development priorities and goals of the region and local communities.”

The public is invited to review the draft plan and submit comments. Comments can be made by email to InfoCenter@semcog.org or by calling 313-324-3330.

We did serve on this plan’s Bicycle and Pedestrian Task Force, which was co-chaired by Detroit Council Member Scott Benson.


Preserving public right-of-ways near the LCA

Olympia Development petitioned the city to vacate the public easements for two east-west roads (Sproat and Henry) on both sides of the Little Ceasar’s Arena. We were concerned about losing public access for bicyclists, pedestrians, and transit users.

We brought this to Council member Benson who worked with the engineering department to modify the requests so that the right-of-ways are preserved for those on bikes or foot.

We monitor city council agendas and review all petitions that remove public right-of-way access.  We find that often the petitioner is only interested in removing motor vehicle access.

We had a similar case where a petitioner sought to remove a public road next to the Conner Playfield/Conner Creek Greenway on the eastside. The road’s onstreet parking provided the only vehicle parking for the playfield, so we again worked with Council member Benson to keep the road and the playfield’s parking.


MoGo is Hiring

MoGo is expanding the public bike share system to Northwest Detroit and Southern Oakland county. They’re adding another 31 stations and 140 bikes in six cities. They’re also hiring. Visit their website for more information.

Categories
Uncategorized

2020 Snapshot

We created this graphic to highlight Detroit’s progress towards a more bikeable and walkable city — as well as our role.

Categories
Complete Streets

The Community decides on Complete Streets

Photo from Alexis Wiley’s Twitter feed

Mayor Mike Duggan led a community meeting to discuss four streetscape options for W. McNichols just west of Livernois. The first was to rebuild what already existed, a two-lane road with on-street parking on both sides. The second and third options added landscaping and bumpouts. The fourth converted one side of the on-street parking into a two-way bicycle lane.

After a couple hours of community input and discussion, the group voted. It came down to options 3 and 4. While business owners preferred the additional parking in option 3, the city had created an off street parking lot for 88 vehicles — and could add more.

The vote was 39 to 12 in favor of adding the bike lanes. Project construction will begin later this year.

Approaches to Advocacy

Some bicycle and Complete Streets advocates take more adversarial approach (e.g. the War on Cars.). Some bring an intellectual elitism that is willing to belittle local decision making in communities they know little about. We don’t partner with these groups.

We have confidence that Complete Streets can help solve existing community issues like speeding, pedestrian safety, blight removal, access to parks, economic development, etc. The key is to bring all the information to a pragmatic discussion and let the community decide. They may not always support bike lanes and other Complete Streets designs — and advocates may have to live with that.

Certainly there are voices opposing Complete Street designs. While there are valid concerns, most aren’t well support by data. We’ve heard bike lanes emphatically called “the most dangerous thing in Detroit.” We’ve heard bike lanes blamed for causing one persons car crash. (They didn’t. We pulled the police report.) We heard our electronic bike counters on E. Jefferson were wrong because some only saw about three bicyclists in a month. We’ve heard that bike lanes being built for white suburbanites despite the very visible, growing Detroit #bikelife movement.

What have we not heard many say publicly (at least not directly)? That they want to continue driving faster than the speed limit and be able to pass traffic in the curb lane. Bike lanes help curb those unsafe practices. It’s one of the major benefits to bike lanes. They reduce speeding and reduce crashes among everyone: motorists, pedestrians, and bicyclists. Bike lanes are not just for bicyclists’ benefit. They especially improve pedestrian safety in a city with one of the nation’s highest pedestrian fatality rates. They’re like speed humps for major roads.

There will nearly always be opposition any time changes are proposed. There was opposition to the Dequindre Cut before it was built. Once it was a success, the change was embraced, which helped open the door for future greenways in Detroit.

Successful Complete Streets can do the same.

Additional Reading

Categories
Complete Streets Greenways Newsletter

News from the Trail – December 2019

#GivingTuesday

Tuesday, December 5th is #GivingTuesday. We could use your support to help us continue our work into 2020. Any donation would be appreciated.

There are two ways to give:

  • We have a fundraiser on Facebook. Facebook is waiving all transaction fees. They are matching the first $7 million in all donations starting on #GivingTuesday at 8 AM.
  • We also have a donation page on our website with payments handled through PayPal.

Our vision is for a citywide network of safe, convenient, and fun pathways for biking and walking. We’re clearly not there yet despite all the progress made since we began in 2007. The Joe Louis Greenway — a project we helped mature and wrote grants for $4.5 million — is a big start, but there are others. We:

  • Proposed a greenway along the Rouge River and now the intial portions of that are being designed.
  • Advocated to upgrade existing projects, such as the Conner Creek Greenway and the Iron Belle Trail.
  • Helped start the Detroit Complete Streets push years ago and now there are Complete Streets staff at city working on projects across the Detroit.
  • Led advocacy efforts to get a biking and walking trail on the Gordie Howe International Bridge, which will now be connected to the Joe Louis Greenway.
  • Partnered with Highland Park to ensure they are not forgotten in these improvements and wrote a couple grants to design and build their first Complete Street on Hamilton.
  • Have even been involved in freeway projects like I-94 and I-375 to ensure their new designs improve walking and biking in Detroit while reconnecting neighborhoods.

And since 2007, we’ve helped advocate and educate city staff, elected officials, and the public on the value in Complete Streets, bike lanes, parks, and green stormwater management. We need to continue this work and your donation helps. Thank you!


Joe Louis Greenway

The City of Detroit is hosting two public sessions titled “Joe Louis Greenway – Cocoa and Conversation”:

  • Wednesday, December 4th from 6-8pm at the Lexus Velodrome, 601 Mack Avenue (near I-75). Doors open at 5:30pm. The indoor walking track will be open and you can watch bicyclists riding on the track, too.
  • Tuesday, December 10th from 6-8pm at the Unity Baptist Church, 7500 Tireman Street. Doors open at 5:30pm.

It is expected that a updated draft of the Joe Louis Greenway Framework Plan will be presented.

This will be the third and final set of community input sessions the City of Detroit and its design team are organizing.  During the first and second set of community input sessions participants discussed and voted on greenway design elements such as surface, buffers, landscaping, fencing and special features.  The Framework Planning will be completed by February 2020.

Here is the City of Detroit’s most recent routing plan.


Detroit Stormwater Hub

The Nature Conservancy and the Detroit Water and Sewage Department (DWSD) led efforts to design, create, and launch the Detroit Stormwater Hub. We were part of the 25-member advisory team that helped shape, design, test, and market the final product.

What is the Stormwater Hub? It’s a website that shows Green Stormwater Infrastructure (GSI) projects across Detroit — 172 projects as of now!

Greenways and green Complete Streets provide an excellent opportunity to manage stormwater through GSI. Doing this can reduce flooding, improve water quality, and create beautiful natural areas. We expect this website will spur greater interest in building more GSI while complementing our work on Complete Streets and greenways.


Upcoming Events

  • A Grant Parklet Community Meeting is scheduled for Tuesday, December 3rd at 6pm at the Grandmont Rosedale Development Corporation (19800 Grand River). The new parklet will be located just across the street. As you may recall, Grand River is being reconstructed as a Complete Street with improved sidewalks, crosswalks, and bike lanes.
  • The first community meeting for the Gratiot/7 Mile Neighborhood Framework Plan is Thursday, December 12th. The meeting will be held at The Matrix Center, 13560 E. McNichols. Doors open at 5p. Dinner will be served at 5:30p. The program will begin promptly at 6p. All ages welcome!
  • Free Bikes 4 Kids is seeking volunteers for their bike giveaway days — Saturday, December 14th and Sunday, December 15th. This is when restored bicycles will be distributed to kids in the community. Visit their volunteer signup page to learn more.

For the most recent news, follow us on Twitter and Facebook

Categories
Friends of the Joe Louis Greenway Greenways Newsletter

Friends of the Joe Louis Greenway – November 2019

Framework Plan Public Meetings

The City of Detroit is hosting two sessions titled “Joe Louis Greenway – Cocoa and Conversation”:

  • Wednesday, December 4th from 6-8pm at the Lexus Velodrome, 601 Mack Avenue (near I-75). Doors open at 5:30pm. The indoor walking track will be open and you can watch bicyclists riding on the track, too.
  • Tuesday, December 10th from 6-8pm at the Unity Baptist Church, 7500 Tireman Street. Doors open at 5:30pm.

It is expected that a updated draft of the Joe Louis Greenway Framework Plan will be presented.

This will be the third and final set of community input sessions the City of Detroit and its design team are organizing.  During the first and second set of community input sessions participants discussed and voted on greenway design elements such as surface, buffers, landscaping, fencing and special features.  The Framework Planning will be completed by February 2020.

The planned Joe Louis Greenway is 32 miles and will be constructed in phases. Here is the City of Detroit’s most recent routing plan.

What’s Under Construction

The Joe Louis Greenway includes other trail and streetscape projects. Three of those are currently under construction.

  • Livernois Streetscape — There is a offshoot of the Greenway that heads north along Livernois and connects to Ferndale. Livernois between Margareta and Eight Mile is being completely reconstucted. Wider sidewalks and sidewalk-level bike lanes are included. Most of the construction will be completed this year. The Livernois businesses have suffered a bit during construction, so we’re encouraging everyone to patronize them whenever possible.
  • Bagley Streetscape — This is a short segment of the proposed Greenway route between I-75 and 24th Street in Mexicantown. The reconstruction is making this street look and feel more like a pedestrian plaza (that happens to be lined with great Mexican food!) Depending on the weather, this project should be completed this year.
  • Riverfront Extension — This is a portion of the RiverWalk that connects the Ralph C. Wilson Jr. Centennial Park (formerly West Riverfront Park) with the RiverWalk near the former Joe Louis Arena site. Concrete has been poured on portions of this segment. We expect this to be open sometime next year.