Categories Complete Streets Greenways Newsletter Policy Safety & Education News from the Trail – November 2022 Post author By Todd Scott, Executive Director Post date November 29, 2022 2 Comments on News from the Trail – November 2022 Link to our November 2022 newsletter Share this:Click to share on Facebook (Opens in new window)Click to share on X (Opens in new window)Click to share on LinkedIn (Opens in new window)Click to share on Threads (Opens in new window) Related Tags Gordie Howe International Bridge, Joe Louis Greenway, MDOT, pedestrian bridge, Tunnel Bus ← News from the Trail – July 2022 → Detroit gets $24.8 million road safety grant 2 replies on “News from the Trail – November 2022” What is this Dequindre cut extension you speak of? Phase 2 was completed over 6 years ago. This is the Dequindre Cut Extension 2.0 between Mack and E. Grand Boulevard. THere mores information starting on page 26 of this presentation. https://detroitmi.gov/sites/detroitmi.localhost/files/2022-10/2022_1024%20DONCast%20Dequindre%20Cut%20Hamtramck.pdf Leave a CommentCancel reply
This is the Dequindre Cut Extension 2.0 between Mack and E. Grand Boulevard. THere mores information starting on page 26 of this presentation. https://detroitmi.gov/sites/detroitmi.localhost/files/2022-10/2022_1024%20DONCast%20Dequindre%20Cut%20Hamtramck.pdf
2 replies on “News from the Trail – November 2022”
What is this Dequindre cut extension you speak of? Phase 2 was completed over 6 years ago.
This is the Dequindre Cut Extension 2.0 between Mack and E. Grand Boulevard. THere mores information starting on page 26 of this presentation.
https://detroitmi.gov/sites/detroitmi.localhost/files/2022-10/2022_1024%20DONCast%20Dequindre%20Cut%20Hamtramck.pdf