Below are our comments on the draft MDOT 2024-208 Five-Year Transportation Plan. You can submit your own comments before September 8th, 2023.
- I-94 Modernization Project. We are critically disappointed that funding for this project has apparently been delayed by two decades. The Complete Streets/Multimodal portions of this project were highlighted in prior five-year plans, but with the new time frame, we see these as broken promises to reconnect the community.
- Hubbell Street bridge deck replacement over I-96. We would like to see this bridge cross section improved to better accommodate bicyclists with bike lanes, preferably grade-separated bike lanes. This segment of Hubbell is very popular for Detroit bicyclists since it is easier to cross I-96 at Hubbell since there are no interchange nor grade changes. The popularity of this route is shown on the Strava heatmap for bicyclists.
- Virgil Street bridge deck replacement. This bridge should be also designed to better accommodate pedestrians and bicyclists, preferably with grade-separated bike lanes. This bridge provides a critical community connection across I-96 with Eliza Howell Park to the north and Rouge Park on the south. City of Detroit plans envision this bridge carrying the Rouge River Greenway.
- Pedestrian Bridges. We like seeing the Vassar and Sawyer bridges being replaced as well as the addition of a Verne bridge over I-94. However, we want the Spruce bridge added to the plan as well. This is a critical community connection for North Corktown with no legal, direct, or viable alternative for bicyclists.
- Fort Street (M-85) road rehabilitation from Rosa Parks to Griswold. We want this designed as a Complete Street. It provides a critical, direct connection between the Gordie Howe International Bridge and Downtown Detroit.
- US-12 and Gordie Howe International Bridge. We are glad to see these projects moving forward within this plan. We have led the non-motorized advocacy on these projects and look forward to celebrating their completion.
- Carbon Neutrality. We see no mention of MDOT plans to reduce GHG emissions and help make Michigan carbon neutral per the Governor’s commitment. In fact, the plan includes many major and minor widening projects that will induce higher VMT and increase GHG emissions.
At first glance, it appeared this five-year plan removed prior MDOT commitments for the Iron Belle Trail/Conner Creek Greenway bridge over I-94. After conversations with the City of Detroit and MDOT, we learned that it wasn’t removed. It was no longer individually identified and had been wrapped into another I-94 phase line item. This is confusing. We ask that MDOT consistently list projects for each five-year plan so the public can more accurately determine what changes exist or do not exist.