Categories
Greenways

“Detroit will be America’s best city for bicycling”

Detroit Planning Director Maurice Cox and D-Town Riders CEO Ashia Phillips
Detroit Planning Director Maurice Cox and D-Town Riders CEO Ashia Phillips

That’s not a quote from us. It’s a quote from Maurice Cox, Planning Director for the City of Detroit. He actually said it was a stated fact and it was something he wanted to accomplish during his tenure. He said it during a meeting last week with various bicycle stakeholders.

One way this will come true is by completing the Inner Circle Greenway. We were also at another meeting earlier that day with Cox and a couple of his planners, the Mayor’s Office, the Department of Public Works, and others to discuss the city’s TIGER grant for the Inner Circle Greenway. The Inner Circle has become much more than 26-miles of rail-trail and bike lanes. It’s about connecting Detroit residents to jobs and schools, providing multi-modal connections, improving quality of life, and revitalizing the neighborhoods and business corridors. While the group has not agreed on the final grant language, there is consensus that we needed to put forth the best TIGER grant possible.

The next day we led a van tour of the Greater Downtown area from the Riverfront to the North End and from Eastern Market to Mexicantown. The tour included stakeholders, Cox and a few members of his planning department, and a couple consultants. We stopped at various spots throughout the area to show the different street types, e.g. wide spoke roads, wide one-way arterials, wide boulevards, and more. Detroit has a wealth of vacant land on its roads that can be converted to a protected bike lane network throughout the city — something that nearly falls within our Coalition’s vision.

The tour also stopped at some challenging intersections (e.g Gratiot/Randolph/Broadway, Trumbull, MLK, Grand River.) We also made sure to highlight the poor maintenance of the existing bike lanes. Safety and education were also discussed.

The only surprise of the tour was a quick positive update on a related project. We were told that information must remain on the van for now, but we can say that everything is on the table. Bureaucracy and status quo are no longer acceptable excuses for making bad transportation decisions in Detroit.

While the van limited how many could join in, we were very fortunate that Ashia Phillips from D-Town Riders Bike Club could participate and share some perspectives on how bike infrastructure can better support the city’s growing bike club scene. For examples, should we plan for more bike meetup/rest areas like Harmonie Park? These areas could have bike repair stations, water, bathrooms, and local businesses.

There will be followup meetings later this year with the opportunity to bring many more Detroiters and bike clubs into the discussion of how to make the city a better place for biking. This is just the beginning of a very exciting planning effort.

Our wide roads, low traffic volumes, and abandoned rail corridors give Detroit a big advantage over other cities when it comes to making better biking opportunities. With these opportunities as well as the bike clubs, rides and many other Detroit bicyclists, it getting much easier to envision being the number one city.

Categories
Greenways History

Joe Louis Greenway: Bridging over freeways

Before & after I-96 freeway

This article has been updated to reflect the name change from Inner Circle Greenway to Joe Louis Greenway (except for the image label.) We’ve also embedded this tweet from USDOT Sec’y nominee Pete Buttigieg.

U.S. DOT Secretary Anthony Foxx has recently called out freeways and how they were rammed through poor neighborhoods.

That certainly happened in Detroit — and it was intentional.

According to the 1945 Detroit Expressway and Transit Plan, “Genuine, large-scale slum clearance to let in sunlight and air can be accomplished by opening up wide arteries and often can be hitched to an expressway project by going just a little out of the way at an inconsequential time loss.”

This was reflected in the expressway route recommendations:

  • Grand River Expressway (Now I-96)  “Through much of its length it would take land in substandard areas where there is acute need for the incidental improvements to the ex­pressway.”
  • Lodge Expressway (M-10)  “[It] would lay the backbone for the rehabilitation of a neighborhood that badly needs it. The alignment has been judiciously planned to fit in with the layout of the proposed Jeffries housing project.”
  • Hastings Expressway (I-75/I-375)  “[It] would pass through substandard areas… Acquisition of the right-of-way actually would constitute a slum clearance project for much of its 6.8 miles of length and construction of the expressway would invite and justify private development of wide scope along it.”

The plan also called for non-motorized improvements that were never realized.

“Walks and promenades with benches should be fitted into the landscaped slopes wherever possible. Bicycle paths could be included for some stretches at comparatively little additional expense. These features would be very popular and would make the expressways useful for Detroiters and visitors who are without automobiles.”

So, we’re excited to hear Secretary Foxx talk about righting these wrongs and we think the Joe Louis Greenway has a role. Over its 26 miles, the greenway has eight improved non-motorized freeway crossings.

One of the major connectors is in Northwest Detroit where the proposed greenway crosses the Davison entrance ramp and I-96. We’ve found DTE aerial photographs from 1967 and 1997 that show the before and after affects of I-96 in this area. By moving the center slide left and right, one can see how schools, parks, local businesses and neighborhoods were severely divided.

While we have no delusions that the Joe Louis Greenway can mitigate all of the expressways impacts on Detroit neighborhoods, it can be valuable start.

Categories
Greenways

Five most impactful Detroit bike and trail projects for 2016

With all that’s going on — not to mention Slow Roll, the expanding diverse bike club culture, Tour-de-Troit, and bike manufacturing — Detroit deserves greater national attention as a great biking and trails city.

To help prove that, we’ve made this list of major projects that are really going to make a great impact this year. These are not in any specific order.

Link Detroit: Dequindre Cut, Eastern Market, Midtown Connector

20150921_180244Yes, this was on our 2015 list, too, but it’ll officially open this spring. $20+ million projects certainly deserve being mentioned twice. While most of the construction is complete, the security boxes and cameras won’t be operational until spring. There’s also continued work happening on those private properties along the Dequindre Cut.

The bike lanes along Wilkins, Brush, Mack, and St. Aubin are complete. There’s also much new bike parking in and around Eastern Market.

A grand opening ceremony will be announced for the spring as well.

Cass Ave Bike Lanes & Midtown Loop

Cass Avenue Bike RouteThis Midtown Detroit project began last year but will finish this year. The bike lanes start at W. Grand Boulevard and continue south to Lafayette. The route gets sharrows and proceeds a east one block to Washington before continuing south Cobo Center. Here,  the route transitions to an an off-road path heading east along the south side of Jefferson to Bates Street, which connects to the RiverWalk.

When you’re going downhill (and fast) on Bates, you get sharrows on the road. When going uphill (and slower), you’ll have a protected bike lane.

This project also includes:

  • The final section of the Midtown Loop streetscaping between Kirby and Canfield
  • Three public bike repair stations
  • Multiple in-ground, automated bike counters with two kiosks displaying real-time counts

This project was largely funded by MDOT to help make Cass a more desireable bike corridor than Woodward since the M1 Rails are causing safety issues with bicyclists’ tires.

While not part of this project, the underpass at Cass is now a public art display.

We’ve also been working with City Council and Olympia Development to upgrade a portion of these bike lanes as part of the new hockey arena construction. And in the long term, we hope to extend this Cass Avenue bike route to the Detroit Zoo using both Second and Woodward Avenues.

Automated counters

Mobile bike counter on Cass AvenueWe know more people are biking and walking but we don’t have numbers. That’s about to change as automated counters start operating 24/7 on Cass with real-time data uplinks. The Dequindre Cut extension is also getting three counters which will tally bicycles as well as pedestrians. While this data won’t tell us the total number of people on bikes or foot, it will show trends.

The Detroit Greenways Coalition will also be using our mobile bike counters again this year. In 2015 we took counts on Cass Avenue and E. Jefferson before any bike lanes were installed. We want to have before and after counts so we can measure the impacts these projects are having — and justify continued non-motorized investment.

Public Bike Share and Street improvements

The Downtown Detroit Partnership (DDP) is still hopeful about launching this year. The anticipated footprint is from Clark Park to Belle Isle, and from the River to W. Grand Boulevard. Phase I calls for 35 stations and 350 bikes. The great news is Henry Ford Health System/Health Alliance Plan have signed on as the title sponsor. We’ve been working with the DDP and others to insure this bike share access is inclusive and serves a diverse audience.

With all these new bikes will increase demand for more bike lanes in the Downtown and the DDP is working to address that through road diets and one-to-two way conversions in the near future.

Livernois Bike Lanes

The City of Detroit installing bike lanes on four miles of Livernois from Grand River to W. Vernor. Eventually we expect to continue this route to Historic Fort Wayne and the Detroit River as part of the Gordie Howe Bridge U.S. Plaza project.

Detroit Planning Director Maurice Cox has also announced intentions for pop-up (i.e. short-term prototype) bike lanes on Livernois in the Avenue of Fashion between McNichols and Eight Mile. There’s not enough width between the outside curbs for four vehicle travel lanes, two parking lanes, and bike lanes. Would the street work with two vehicle lanes? This is one way to find out and it’s a technique that could be applied on other roads.

Having better biking facilities on this portion of Livernois would be very welcomed as they could connect with Ferndale’s bike lanes (and their downtown) to the north and the river/Fort Wayne/Canada via the Gordie Howe Bridge to the south.

Honorable Mentions

Some of these projects are super exciting as well. Some are not yet ripe and we can’t provide specific details yet but we wanted to note that they’re moving forward.

  • 20151105_173047E. Jefferson Protected Bike Lanes — Jefferson East got the city’s first protected bike lanes installed last year just west of Alter Road. The city’s plan is to extend that same design all the way to E. Grand Boulevard/Belle Isle. The timing and scope of this project is not clear. When complete, this will be one of the longest protected bike lane projects in the U.S.
  • RiverWalk section — A new section of East RiverWalk is under construction between Jos Campau and East Chene Park. It’ll also include a bridge over an old boat slip.
  • Inner Circle Greenway — The $10 million TIGER grant was not funded last year which would have built about six  miles of the Inner Circle Greenway. We now developing a revised funding plan, which may include another TIGER grant request. In the meantime, the rail corridor land acquisition is progressing.
  • Beltline Greenway — We helped get significant Iron Belle Trail funding to acquire land for the proposed Beltline Greenway from the RiverWalk (at Mt. Elliott Park) to Gleaner’s Food Bank. Progress is being made in a collaborative effort with the DNR, city of Detroit, DECC, and the Coalition.
  • Elmwood Greenway — We partnered with Elmwood Cemetery on a grant request to further plan an off road trail from Gleaners/the Beltline Greenway to the Dequindre Cut near Gratiot. We expect the greenway would connect into the historic cemetery as well.
  • International Greenway Vision Map — We are working with a large number of parties on both sides of the Detroit River produce a map that highlights the greenways and bike routes adjacent to our international border. We want to show the value in building connections between the U.S. and Canada so bicyclists can enjoys both countries without needing a car. That could mean ferry service between downtown Detroit and Windsor, as well as bike lanes on the Gordie Howe Bridge.
  • Open Streets — We’ve been working with the DDP, DTE, City of Detroit, Wayne State, and others to bring one or two Open Streets events to Detroit in 2016.
  • Indoor Velodrome — There’s nothing official to report yet, but the project is moving forward.

 

Categories
Complete Streets Greenways In the Media Newsletter

Coalition Updates – December 2015

Welcome to December!

#GivingTuesday is nearly over, but there’s still an opportunity to make a tax-deductible contribution to the Coalition. By donating through the PayPal fund, service fees are waived and they’ll add an additional 1%.

We were recently featured in an NBC News article and video, Motor City to Bike City: Inside Detroit’s Bicycle Renaissance. It was a great opportunity to highlight all the work being done in Detroit and the impact it’s having in making the city more bike-friendly.

Digging Detroit also published a video, Rails-to-Tales: Detroit’s Inner CIrcle Greenway. It includes footage from the abandoned rail corridor as well as historic photos.

While much progress has been made on the Inner Circle Greenway recently, there has been some unfortunate news. Detroit’s $10.4 million federal TIGER grant was not selected. The TIGER program is hyper-competitive, so that’s not too much of a surprise. The Coalition is working with the city on alternative funding plans which may include another shot at TIGER.

We recently biked with Detroit’s Planning Director Maurice Cox and MDOT’s projects managers for the I-94 widening project. We rode along the I-94 corridor and discussed mostly negative impacts MDOT’s project will have on biking and walking. We’ve been highlighting these concerns for years now so having Maurice involved and being equally concerned is very welcomed. We can’t afford to lose pedestrian bridges and other key community connections across the freeways.

 

2016 Events
We are making plans for next year and expanding upon our successful Bike Trails & Cocktails event. Initial plans are to host these events quarterly. Some will include bike tours, guest speakers, and more.

Stay tuned as we expect to announce more details in the coming months.


Categories
Greenways

Growing city support for greenways in Detroit

2015 Bike Trails and Cocktails bike tour mapSeven years ago our only major biking and trails proponent was packing up his desk at the Detroit Mayor’s office and heading back to a job in the private sector. Our city support was looking bleak.

What a change we’ve seen since then!

We now have supporters throughout most city departments and in the Mayor’s office. Though Detroit has many challenges and priorities, our work is seen as an important quality of life issue from the neighborhoods to downtown.

This summer we’ve gained another supporter with the new Planning and Development Director Maurice Cox. We heard this support firsthand at a recent event on the RiverWalk

With help from the Detroit Food and Fitness Collaborative and Bedrock Management, the inaugural Bike Trails and Cocktails event was held. It began with a guided 8-mile bike tour of nearby greenway projects with assistance from Detroit’s Eastside Riders bike club. This tour included recently completed portions of the Detroit RiverWalk, the Dequindre Cut Extension, the planned Beltline Greenway and Elmwood Connector.

At the ride’s conclusion, the Detroit Riverfront Conservancy provided more updates on their work and answered questions.

Next up was Cox who made a statement by riding to the event. This was not atypical for him though. He bikes to work, to Eastern Market, and all around town. Biking has been his primary means of transportation long before he got to the Motor City and he sees no need to change.

Bike-Trails-and-Cocktrails-by-Khalil-LigonLiving in Lafayette Park, he uses the nearby Dequindre Cut often. He told the attendees that every Detroit neighborhood deserves a great greenway like this — something that’s very much in line with the Detroit Greenways Coalition vision and Food and Fitness Collaborative goals.

One major project that will bring a greenway to many Detroit neighborhoods (as well as Hamtramck, Highland Park and Dearborn) is the 26-mile Inner Circle Greenway. Cox spoke highly of the project and the opportunity to look beyond just the trail. He added that the greenway can be catalyst for development similar to the Atlanta Beltline.

He also stressed the value in having the Coalition in Detroit to help show community support. He told the crowd that he would join the Coalition before the event was over. He also noted that he was heading to Copenhagen the next day as part of a study tour that looks at progressive European transportation and public space designs that are people-focused. We’re looking forward to what ideas he can bring back to Detroit.

What a change from seven years ago!

 

Categories
Greenways

Register now for Inaugural Greenways bike tour

Bike Trails and Cocktails

  Registration is closed for this event
Detroit Greenways Coalition bike tour and gathering

The Detroit Greenways Coalition (DGC) invites you to join us on Thursday, September 17, 2015 for a bike tour to showcase some of our supported projects on Detroit’s Eastside. The Detroit Greenways Coalition strives to make Detroit a world-class city for biking and walking. Our  mission is to create, conserve, and promote greenways and green spaces to connect people, places and nature. We hope this will be the first of many group rides where we explore DGC supported projects in the region, and there is no better time to start than during Detroit Bike Week!

Our route will be a leisurely ride of approximately 8 miles. We will be led by Board members and volunteers of the Detroit Greenways Coalition. Guests will enjoy appetizers before and after the ride, and drink specials will be available.

Tickets are $25 and the first 100 get event T-shirts. You can save $10 by registering and adding a Detroit Greenways Coalition membership. We are a non-profit and your membership is tax-deductible.

Major thanks to our event sponsors Bedrock and the Detroit Food and Fitness Collaborative for making this event possible.

When
September 17th, 2015 from  5:00 PM to  8:00 PM
Location
201 JOSEPH CAMPAU ST
DETROIT, MI 48207-4118
United States
Show large map
Contact
Phone: (313) 649-7249 ext. 
Event Fee(s)
Registration $25.00
Add a DGC membership and save $10!
Adult $25.00
Student/Senior/Limited income $10.00
Family $35.00
Supporter $90.00