Categories
Greenways Newsletter Safety & Education

News from the Trail – March 2020

Well that’s not how we expected spring to start! With the weather starting to warm up, we’re all  making plans for group rides, runs, and races. The Coronavirus has put the season on hold. Of course the top priority is for everyone to remain physically and mentally healthy — and that still includes riding, walking, and running while practicing safe social distancing.

The City of Detroit has issued this update on their parks:

To reduce the spread of COVID-19, the City of Detroit has closed all of its recreation centers through April 5, 2020. Park facilities such as clubhouses, community centers, and public restrooms will also remain closed during this time.

Recent evidence suggests that the COVID-19 virus can live for several days on surfaces such as playgrounds and other “high touch” areas in public spaces. For this reason, please refrain from using playgrounds or other park amenities, and instead focus on taking long walks or bike rides, practicing social distancing of at least 6 feet from other individuals.

The Michigan Department of Natural Resources (DNR) also announced the motor vehicles can now access Belle Isle and other state parks without a Recreation Passport during the COVID-19 situation. Note that restroom buildings will are closed. The DNR notes:

We know there’s been a steady stream of “closure” information and messaging about self-isolating to slow the spread of COVID-19. It’s true, we are in uncharted territory, and such steps are critical in protecting Michigan residents from coronavirus risk. Safeguarding mental health is just as important, and spending time outdoors – whether in your backyard, on your balcony or in big, open spaces – can boost mind, body and spirit.


Cancelled and postponed events

The Green Task Force Earth Day Celebration scheduled for April 18th has been cancelled. On a related note, we are taking a larger role in the Detroit City Council’s Green Task Force. We are now co-chairing a new Transportation and Mobility Subcommittee that meets the third Tuesday of each month at 4 PM. Everyone is welcomed to attend.

Our Detroit Bike to Work Day will be pushed back to June. We’re also taking this opportunity to modify the event and broaden its scope to be more than just about getting to work. It’ll be more about biking for transportation, for health, and for sustainability. We look forward to sharing more event updates soon.

We are still planning our Joe Louis Greenway Fundraiser Ride for June 21st. The starting location and route will be updated this year to take advantage of the city’s new greenway routing. Save the date and we’ll let everyone know when the registration opens.


APBP Michigan Webinar Series

The Association of Pedestrian and Bicyclist Planners (APBP) offers monthly webinars on a variety of topics. We find them an invaluable resource for staying on top of the rapidly changing bike/pedestrian environment. Individuals can pay for individual webinar access through the APBP website ($50 members & $85 non-members).

Now, thanks to APBP and the Michigan Chapter, there is a free option. The Detroit Greenways Coalition and SEMCOG are co-hosting the webinars in Detroit at the SEMCOG offices (1001 Woodward Avenue, Suite 1400.

We have a list of the 2020 webinars on our website and APBP has more details on theirs.

Webinars are from 3 pm to 4 pm. More information on each webinar is available on this APBP webpage.

APBP has applied to the AICP for 1.0 Certification Maintenance credits for these webinars.


Thanks, Ashok Patel!

Bike to Work Day 2018 - Ashok Patel, Prasad Nannapaneni, Janet AttarianThere are many City of Detroit staff that are making this city a better place to bike, walk, and run. One of those staff members recently retired: Ashok Patel, who led the Traffic Engineering Division of the Department of Public Works. We first worked with Mr. Patel to help get the Corktown bike lanes approved. He worked with us and MDOT to bring a road design workshop to the city which led to another citywide investment in bike lanes. His contribution to this progress has been significant!

A Detroit City Council Testimonial Resolution also mentions that he “encourages all of the employees in the Traffic Engineering Division to bike.” This has been helpful because it has given the engineers a wider perspective on how road design affects all users.

Congratulations on your retirement, Mr. Patel, and we’ll look forward to seeing you out on the bike.


Other updates

  • The City of Detroit is planting 10,000 trees across the city. If you want one planted in front of your home between the sidewalk and street, call 313 224-6391 or email squalisa@detroitmi.gov. Did you know street trees are one way to reduce speeding vehicles on residential streets? They also help reduce stormwater runoff.
  • The RiverWalk between Cullen Plaza and GM Plaza has reopened. You may recall an errant boat was driven into the RiverWalk last year and caused major damage to the railing. The Detroit Riverfront Conservancy has completed the repair.
  • The Conservancy is also seeking seasonal and trull time support for park operations. The application deadline is March 25th.
Categories
Complete Streets Greenways Newsletter

News from the Trail – December 2019

#GivingTuesday

Tuesday, December 5th is #GivingTuesday. We could use your support to help us continue our work into 2020. Any donation would be appreciated.

There are two ways to give:

  • We have a fundraiser on Facebook. Facebook is waiving all transaction fees. They are matching the first $7 million in all donations starting on #GivingTuesday at 8 AM.
  • We also have a donation page on our website with payments handled through PayPal.

Our vision is for a citywide network of safe, convenient, and fun pathways for biking and walking. We’re clearly not there yet despite all the progress made since we began in 2007. The Joe Louis Greenway — a project we helped mature and wrote grants for $4.5 million — is a big start, but there are others. We:

  • Proposed a greenway along the Rouge River and now the intial portions of that are being designed.
  • Advocated to upgrade existing projects, such as the Conner Creek Greenway and the Iron Belle Trail.
  • Helped start the Detroit Complete Streets push years ago and now there are Complete Streets staff at city working on projects across the Detroit.
  • Led advocacy efforts to get a biking and walking trail on the Gordie Howe International Bridge, which will now be connected to the Joe Louis Greenway.
  • Partnered with Highland Park to ensure they are not forgotten in these improvements and wrote a couple grants to design and build their first Complete Street on Hamilton.
  • Have even been involved in freeway projects like I-94 and I-375 to ensure their new designs improve walking and biking in Detroit while reconnecting neighborhoods.

And since 2007, we’ve helped advocate and educate city staff, elected officials, and the public on the value in Complete Streets, bike lanes, parks, and green stormwater management. We need to continue this work and your donation helps. Thank you!


Joe Louis Greenway

The City of Detroit is hosting two public sessions titled “Joe Louis Greenway – Cocoa and Conversation”:

  • Wednesday, December 4th from 6-8pm at the Lexus Velodrome, 601 Mack Avenue (near I-75). Doors open at 5:30pm. The indoor walking track will be open and you can watch bicyclists riding on the track, too.
  • Tuesday, December 10th from 6-8pm at the Unity Baptist Church, 7500 Tireman Street. Doors open at 5:30pm.

It is expected that a updated draft of the Joe Louis Greenway Framework Plan will be presented.

This will be the third and final set of community input sessions the City of Detroit and its design team are organizing.  During the first and second set of community input sessions participants discussed and voted on greenway design elements such as surface, buffers, landscaping, fencing and special features.  The Framework Planning will be completed by February 2020.

Here is the City of Detroit’s most recent routing plan.


Detroit Stormwater Hub

The Nature Conservancy and the Detroit Water and Sewage Department (DWSD) led efforts to design, create, and launch the Detroit Stormwater Hub. We were part of the 25-member advisory team that helped shape, design, test, and market the final product.

What is the Stormwater Hub? It’s a website that shows Green Stormwater Infrastructure (GSI) projects across Detroit — 172 projects as of now!

Greenways and green Complete Streets provide an excellent opportunity to manage stormwater through GSI. Doing this can reduce flooding, improve water quality, and create beautiful natural areas. We expect this website will spur greater interest in building more GSI while complementing our work on Complete Streets and greenways.


Upcoming Events

  • A Grant Parklet Community Meeting is scheduled for Tuesday, December 3rd at 6pm at the Grandmont Rosedale Development Corporation (19800 Grand River). The new parklet will be located just across the street. As you may recall, Grand River is being reconstructed as a Complete Street with improved sidewalks, crosswalks, and bike lanes.
  • The first community meeting for the Gratiot/7 Mile Neighborhood Framework Plan is Thursday, December 12th. The meeting will be held at The Matrix Center, 13560 E. McNichols. Doors open at 5p. Dinner will be served at 5:30p. The program will begin promptly at 6p. All ages welcome!
  • Free Bikes 4 Kids is seeking volunteers for their bike giveaway days — Saturday, December 14th and Sunday, December 15th. This is when restored bicycles will be distributed to kids in the community. Visit their volunteer signup page to learn more.

For the most recent news, follow us on Twitter and Facebook

Categories
Friends of the Joe Louis Greenway Greenways Newsletter

Friends of the Joe Louis Greenway – November 2019

Framework Plan Public Meetings

The City of Detroit is hosting two sessions titled “Joe Louis Greenway – Cocoa and Conversation”:

  • Wednesday, December 4th from 6-8pm at the Lexus Velodrome, 601 Mack Avenue (near I-75). Doors open at 5:30pm. The indoor walking track will be open and you can watch bicyclists riding on the track, too.
  • Tuesday, December 10th from 6-8pm at the Unity Baptist Church, 7500 Tireman Street. Doors open at 5:30pm.

It is expected that a updated draft of the Joe Louis Greenway Framework Plan will be presented.

This will be the third and final set of community input sessions the City of Detroit and its design team are organizing.  During the first and second set of community input sessions participants discussed and voted on greenway design elements such as surface, buffers, landscaping, fencing and special features.  The Framework Planning will be completed by February 2020.

The planned Joe Louis Greenway is 32 miles and will be constructed in phases. Here is the City of Detroit’s most recent routing plan.

What’s Under Construction

The Joe Louis Greenway includes other trail and streetscape projects. Three of those are currently under construction.

  • Livernois Streetscape — There is a offshoot of the Greenway that heads north along Livernois and connects to Ferndale. Livernois between Margareta and Eight Mile is being completely reconstucted. Wider sidewalks and sidewalk-level bike lanes are included. Most of the construction will be completed this year. The Livernois businesses have suffered a bit during construction, so we’re encouraging everyone to patronize them whenever possible.
  • Bagley Streetscape — This is a short segment of the proposed Greenway route between I-75 and 24th Street in Mexicantown. The reconstruction is making this street look and feel more like a pedestrian plaza (that happens to be lined with great Mexican food!) Depending on the weather, this project should be completed this year.
  • Riverfront Extension — This is a portion of the RiverWalk that connects the Ralph C. Wilson Jr. Centennial Park (formerly West Riverfront Park) with the RiverWalk near the former Joe Louis Arena site. Concrete has been poured on portions of this segment. We expect this to be open sometime next year.
Categories
Greenways In the Media Newsletter

News from the Trail – November 2019

Detroit Bike Life

One feature that makes Detroit so unique is its bike club culture, collectively referred to as Bike Life. We’ve yet to find another U.S. city — or any city — with the same number of bike clubs. If you’re in one of the clubs or just ride with them at events like Slow Roll, you know how unique they are from their vests to their bikes. They’re more than clubs. They’re family and they are one of the main reasons why more Detroiters are biking now.

We’ve made it a priority to help them share their story with a worldwide audience and inspire others. We’ve connected them with media such as the Guardian, NBC News, and now, DetroitIsIt. The latter made this great video highlighting the Lanebangerz Westside Wednesday ride. It talks about how it’s not just about the bike. It’s about being apart of something bigger and giving back to the community.

Photo by Damon GarrettMost all of the clubs give back. Many volunteer for the Free Bikes 4 Kidz program, Gleaner’s Community Food Bank, soup kitchens, and more. The North End Bandits just donated 55 winter coats. Grown Men on Bikes (GMOB) and Grown Women on Wheels (GLOW) have partnered with the George Washington Carver Academy in Highland Park for numerous giveaways and fundraisers.

As much as we highlight the latest infrastructure investments, it’s the bike club investments in other Detroiters and especially the youth that are such a critical part of Detroit’s revitalization.

DetroitIsIt also created this related article, Ready to Ride Detroit? Get Moving With Detroit Greenways Coalition.


I-375 Alternatives

The bridges over I-375 are at the end of their lifespan. As a result, MDOT took this opportunity to determine if I-375 should be rebuilt as is or convert it to a more typical city boulevard. After a series of public meetings and evaluation, the latter is the preferred alternative.

We’re on the Local Advisory Committee since this is a chance to improve bikability and walkability both along the current I-375 corridor and across it. A summary of the most recent committee meeting is now online and it includes some preliminary designs. One design shown here includes a new east-west road that would connect Ford Field to Eastern Market. We really like this so long as it’s also designed for those on foot and bikes.

All alternatives include sidewalks and a two-way separated cycletrack from Gratiot to the RiverWalk.

Stay tuned for public meetings where you can provide feedback on some further refined designs.


Henry Ford Hospital Campus

Have you seen the new bike lanes under construction south of the main hospital on W. Grand Boulevard? These really are a step up from what we typically see on road retrofits. The streetscaping looks great. Some of the road re-alignments should also improve mobility.

We’ve recently participated in some streetscape design work for Holden. W. Grand Boulevard should also see some improvements in the near future. We’ve been pushing to get some of these features included in the I-94 Modernization project, too.

All of these changes will make it easier to use healthier transportation options in this area.


Quick Updates

  • The Joe Louis Greenway was 26 miles. With the new routing, it’s over 39 miles. This includes the connection on Livernois up to Ferndale. The City expects to host another round of Framework Planning public meetings next month.
  • We were just in NYC as guests of the High Line Network. The High Line is an amazing greenway but we also loved the Hudson River Greenway. It’s a separated two-way cycletrack that seems to be a good model for the high-priority onroad segments of the Joe Louis and other greenways
  • Clear Water: Detroit’s River Revivial documentary has an exclusive showing at the Redford Theatre on November 14th. Buy your tickets now!
  • Please keep supporting the local businesses on Livernois (Avenue of Fashion), Grand River (Grandmont-Rosedale), and Bagley (Mexicantown.) The associated road construction projects are causing a decline in sales.

Also In the News


For the most recent news, follow us on Twitter and Facebook

 

Categories
Complete Streets Greenways Newsletter

News from the Trail – September 2019

I-94 Project

Riding with MDOT and Planning Director Maurice Cox on a tour of the I-94 project to discuss its impacts on walking and bikingWhy is the Greenways Coalition involved in a freeway project? Freeways in Detroit have disconnected neighborhoods across the city for those on foot or bike. They disconnect them for motor vehicles, too, which funnels all traffic to use high-stress bridges (e.g. Forest and Warren over the Lodge or Mt. Elliott and Conner over I-94.) While Detroit freeways have pedestrian bridges, they are often poorly maintained and have ramps that dump you onto the service drive with speeding motorists.

The I-94 project in Detroit is one attempt to make improvements. We didn’t like the early designs and starting raising issues a decade ago. With the city’s actions, MDOT has proposed major design changes. Key bridges we bike and walk over will no longer be permanently removed — and they’ll be improved. Those pedestrian bridges will be converted to Complete Streets with wide sidewalks, bike lanes, and no ramps. They’re will be fewer new service drives.

One major highlight is the new Iron Belle Trail/Conner Creek Greenway trail segment and bridge over I-94. This provides a safer alternative to the busy (and getting busier thanks to FCA) Conner Avenue.

We’ve written more about this update on our web site with links to MDOT’s Draft Supplemental Environmental Impact Statement or DSEIS.

Public comments on the DSEIS can be submitted through October 28th. MDOT is hosting two public meetings on October 10th in Midtown and on the Eastside. The email address for comments is MDOT-I94comments@michigan.gov.

Though not part of the DSEIS, the Second Avenue bridge over I-94 is getting rebuilt next year and it will be a major improvement for non-motorized users. The Cass bridge will be replaced in 2021. The entire project won’t be done until about 2036, so stay healthy in order to be around for the grand opening.


Joe Louis Greenway

Discussion of affordable housing & economic development on the Joe Louis GreenwayThe City of Detroit has wrapped up a second round of public meetings for the greenway. This time the conversations dove into more details regarding design, affordable housing,  economic development, and more.

One of the biggest changes has been the greenway’s routing in Southwest Detroit. We had originally proposed that the greenway follow W. Vernor since it already had bike lanes and was part of the Southwest Detroit Greenlink. However, the current bike lanes are not ideal and certainly not family friendly. The road is not wide enough for other designs that would preserve the well-used vehicle parking. So, the city is routing the greenway further south and using W. Jefferson. This change connects more points of interest, including the recently renovated Riverside Park, Fort Wayne, the Gordie Howe International Bridge, Woodmere, and Patton Park.

The Framework Plan is expected to be completed by February.


History of Greenways in Detroit

We worked with Gwen Gell from the Taubman College of Architecture and Urban Planning at the University of Michigan who created this amazing report: The Legacy of Bicycles in Detroit Michigan: A look at greenways through time.

Detroit’s automotive heritage casts a heavy shadow over its trails and bicycling history. This report helps shine a light on the latter.

As summary of it with the graphic timeline is now on our web site. There’s also a link to the full PDF version.


Other News

  • Atwater Beach/Valade Park construction continues on the RiverWalk. There’s no announced opening date as of yet but we expect it to be in late October.
  • Spirit Plaza is under construction as it receive an $800,000 upgrade after Council voted to make it permanent.
  • The city’s numerous Complete Streets projects are under construction as well, including Jos Campau (part of the Jos Campau greenway), Bagley Street (part of the Iron Belle Trail), and Livernois (part of the Joe Louis Greenway.) These are major reconstruction projects that are affecting local businesses along them. Please consider supporting these businesses.
  • We recently biked over to Windsor (using the Tunnel Bus bike racks!) to present at the Trans-Canada Trail – Ontario annual meeting. They were very interested in learning what is happening with Detroit and Michigan trails now that we will eventually  be connected via the Gordie Howe International Bridge. There is a great deal of interest in how we promote trail tourism on both sides of the border.
  • We were recently featured on the Beaumont Housecall podcast with Dr. Asha Shajahan. We talked about biking, trails, health and much more.
  • We continue to be involved in the electric scooter discussion, including this recent Bridge article, E-scooters are fast, unregulated and all over Detroit. What could go wrong? We think scooters are another good reason to have a protected bike lane network in Detroit.

Upcoming October Events

  • Conant Streetscape Project community meeting, October 2nd 5:30pm at the Lasky Recreational Center, 13200 Fenelon Street. More details
  • Free Bikes 4 Kidz is looking for donated used bikes for Detroit youth. The big donation day is Saturday, October 5th from 9am to 2pm at 22 Henry Ford Health System locations across Metro Detroit. They are also seeking volunteers. Please help make this program even more successful than last year’s.
  • There isn’t an Open Streets in Detroit this year, but Dearborn is hosting their first! It’s Sunday, October 6th from 11am to 3pm. More details
  • Two community workshops are planned for Corktown on October 9th and 10th. They are focused on transportation, including parking, streetscapes, circulation (e.g. 1 & 2-way traffic), and mobility. These workshops are also in partnership with the Michigan Department of Transportation (MDOT) who is kicking off a Michigan Avenue Planning & Environmental Linkages Study. This 16-month MDOT study will “formalize a future” for Michigan Ave., from Campus Martius to I-96/75 interchange.
  • Lastly, the Michigan Trails and Greenways Alliance is having their Annual Meeting on October 19th at Belle Isle. It’s a free event but you must register. As part of the event, we are leading a short bike tour at 10am, but there’s also a paddle trip and history walk.

For the most recent news, follow us on Twitter and Facebook

Categories
Complete Streets Greenways

Newly proposed I-94 design looks much improved

Riding with MDOT and Planning Director Maurice Cox on a tour of the I-94 project to discuss its impacts on walking and biking

MDOT is reconstructing nearly seven miles of I-94 through the heart of Detroit. The original approved design in 2004 removed many bridges that bicyclists and pedestrians rely on. It also called for new service drives to be added, widening the freeway’s footprint and making the urban environment less walkable and bikeable. The impacts were alarming.

Fortunately there are new design changes being proposed that address these issues — changes that have been supported by the City of Detroit, Detroit Greenways Coalition, and others.

Those changes are in MDOT’s recently released Draft Supplemental Environmental Impact Statement (DSEIS) for the I-94 project.

This DSEIS looks at:

  • Using existing city streets more effectively as local connections instead of building new, continuous service drives adjacent to the freeway
  • Modifying local access ramps to and from I-94, M-10 and I-75 to improve operations and safety
  • Using the “Complete Streets” approach to design bridges and service drives, making them user-friendly for drivers, bicyclists and pedestrians
  • Reducing the overall Project footprint to avoid and minimize impacts

The DSEIS did not reevaluate the need for two additional freeway lanes.

Public comments on these design modifications can be submitted through October 28th. MDOT is hosting two public meetings on October 10th in Midtown and on the Eastside. The email address for comments is MDOT-I94comments@michigan.gov.

Our Initial Thoughts

What we like:

  • Iron Belle Trail/Conner Creek Greenway – The separated trail bridge just west of the Conner Avenue interchange is great. It separates trail users from the heavily trafficked road as well as the on- and off-ramp traffic. It adds some parkland, too. This is a major improvement.
  • John R, Canfield & Ferry bridges – These bridges provide key non-motorized connections and all remain in place with the new plan.
  • Complete Streets bridges versus pedestrian bridges – We don’t like narrow, elevated pedestrian bridges with long ramps as proposed in the original plan. All of the pedestrian bridges will now be narrow roads with bike lanes and wide sidewalks. They will provide the shortest travel distance with no climbing, awkward turns, or blind run-outs on to service drives.
  • Re-aligning bridges – The Holden bridge lines up with Holden! It’ll be a straight shot for all traffic and it helps complement a greenway and streetscape project in that area. Also, the Canfield bridge gets shifted south and will not longer terminate at the northbound service drive. Four Tops will connect to Calumet.
  • Reconnecting city grid – Yes, there are still some bridges lost, but there are many got added back in as well as new ones, e.g. Hastings and Harper.
  • Reducing service drive impacts – Many of the new service drives proposed in the original plan have been dropped. They ones that remain won’t be as wide and will have narrower travel lanes to help slow speeding. Some will be converted to two-way as well.

What we don’t like:

  • Losing the Third Street bridge – There’s no real way around this. What we continue to ask for is a better non-motorized connection from Third Street to Second along the north side of I-94. Ideally that connection would avoid the school vehicle traffic on Antoinette.

One area we want to further review is green stormwater management. It is mentioned, but it appears less specific than we would prefer. What’s quite specific is this project increase impervious surface area by 78.55 acres.

It’s also unclear how the new Harper Avenue extension would cross the proposed Joe Louis Greenway routing near the existing rail line west of St. Aubin. (The plan references the previous Greenway routing on St. Aubin.)

While not related to our work, it’s worth noting that the new plan  saves the United Sound Systems building by moving it one parcel north.