Categories
Complete Streets Greenways Newsletter

News from the Trail — December 2020

Giving Tuesday

Two Ways to Give

We have a fundraiser on Facebook. Facebook is matching the first $7 million in all donations starting on #GivingTuesday at 8 AM.

If you prefer, you can setup your own Facebook fundraiser with the Detroit Greenways Coalition as the beneficially.

We also have a donation page on our website with payments handled securely through PayPal. There’s the option for regular monthly or annual donations as well.

There is no better time to make Detroit a more walkable and more bikeable city. We’ve seen COVID-19 affect our family, friends, and communities. We’ve been unable to do many things we enjoy doing while experiencing the added stress of social distancing.

As a result, many of us have been spending more time outside, at the parks and trails, on our bikes, in our kayaks, running, or walking. It’s helping keep us physically, mentally, and socially healthy, while strenghening our resistance to potential illness. For many it’s also providing an alternative safe travel option with good social distancing.

Others are discovering these outdoor options as well. We’ve seen trail usage increase by over 40% on the Dequindre Cut this year. We’ve also see a growing momentum to make Detroit a more convenient, safe, and fun place to walk and bike — a place with more trails, more Complete Streets (e.g. better sidewalks, bike lanes, speed humps), and more greenspace.

Your donation will help keep pushing this vision forward, not only for us, but for many who will benefit from a safer and healthier city yet are unable to contribute. Your support will enable us to continue our advocacy and technical assistance citywide as we have since 2007.

There an added incentive for donating this year. Under the CARES Act, individual taxpayers can deduct up to $300 in cash donations — even when taking the standard deduction.

We appreciate any and all support.

Stay Healthy,


Todd Scott, Executive Director


Michigan Avenue Improvements

Debris-covered Michigan Avenue bike lanes and sidewalk near the LodgeThere is an opportunity for major improvements to Michigan Avenue’s design through Corktown so mark your calendar for Tuesday, December 2nd at 6pm. MDOT is hosting a virtual public meeting to collect your input. (Meeting details) They need your input!

We’ve come quite a ways from ten years ago when we first asked MDOT to add regular bike lanes to this state trunkline. It was met with a great deal of resistance from both legal and engineering standpoints. We continued to push, find answers to the issues, and was eventually successful. Later those became protected bike lanes.

Now we can push this design forward into something much better, e.g. raised or sidewalk-level bike lanes with curb protection, protected intersections, wider sidewalks, and green stormwater infrastructure. One priority we already shared with MDOT is the need for a maintenance plan. We want a great design that’s also free of debris.

This isn’t just a planning exercise. $20 million in construction funding has been allocated for 2022.

Happening in parallel is the MDOT Connected and Automated Vehicles (CAV) Corridor project along Michigan Avenue and I-94 between Detroit and Ann Arbor. They are looking to design “an innovative infrastructure solution that allows for a mix of connected and autonomous vehicles, traditional transit vehicles, shared mobility, and freight and personal vehicles.” We’re on the project’s stakeholder group and really want to ensure that shiny new transportation concepts don’t interfere with the tried-and-true mobility provided by biking and walking. We’re optimistic given that Mark de la Vergne, Detroit’s former Cheif of Mobility Innovation is now leading this project for the contractor, Cavanue.

Of course Ford’s Michigan Central project is along this section of Michigan Avenue. They recently held a public meeting to share more of their vision for the former train station, surrounding campus, and May Creek Greenway. There’s additional information in this Detroit News article, Ford unveils Michigan Central site plan for Corktown.Rendering of the future Michigan Central Station by Ford


Belle Isle Improvements

Central Avenue on Belle IsleThe good news? The Strand pavement near the Coast Guard station has been replaced. The bad news? The last we checked, some sections of the bike lane are in really poor condition here. Still, you should be able to get around them.

Other updates include the reconfiguration of Central Avenue on the eastern portion of the island. It’s now marked for eastbound vehicle travel only with a two-way shared-use pathway. We would have preferred seeing vehicles prohibited altogether from this roadway, but this is an improvement — and the surface has been repaved.

Phase 1 of the new Iron Belle Trail is also under construction from the beach to the Boat Club. This will be a much welcomed trail for all but the faster, fitness-oriented bicyclists who will prefer staying on the road. The DNR also recommended $1.35 million in Land Water and Conservation Funds (LWCF) to build Phase 2 of this trail which will eventually extend this trail around the island.

We are continuing to advocate for safer bike lane designs on the island, but especially for the MacArthur Bridge. Unfortunately we do not have any updates at this time.


Other Updates

  • Ford Hunger March monumentThe grand opening of the new Fort Street Bridge Park was at the end of October. This park gives recognition to the Ford Hunger March of 1932 with a monument constructed from parts of the original historic bridge. There are additional bridge parts remaining and we’re trying to see if they can be used for a gateway monument to welcome bicyclists and pedestrians entering Detroit via the Gordie Howe International Bridge.
  • We were glad to provide some modest assistance to Council Scott Benson, Greenway Guy Tim Springer, Henry Ford Health System, and others with their Bikes 4 Essential Workers program. It was a great success despite the lack availability of new bikes.
  • The City of Ferndale has a public meeting on December 9th at 6:30pm to review a draft of their updated mobility plan. This is a great opportunity to discuss how to make it easier when biking and walking between Detroit and Ferndale.
  • There’s still time to get involved in the City of Detroit’s Streets for People planning project as well as take an online survey for the Parks and Rec Plan update. Both are very important planning efforts.
  • Detroiter Kristin Shaw is writing a book on women in the mobility/transportation space and she’s looking for nominations of stories to tell — or perhaps your story. Entries are open until the end of the year at www.womendrivenmobility.com.
  • Lastly, Free Bikes 4 Kids Detroit continues to look for volunteers to help them clean, prep, and giveaway kids bikes this year. Their volunteer signup is online.

Additional Reading

Huron-Clinton Metroparks to establish Detroit presence through agreement with Detroit Riverfront Conservancy, Crain’s Detroit Business.

Drivers let their focus slip as they get used to partial automation, Insurance Institute for Highway Safety.

Piloting wayfinding to connect community to resource centers in Detroit, Smart Growth America.

Categories
Greenways Newsletter

News from the Trail – November 2020

Joe Louis Greenway

The City of Detroit held its second public design meeting for Phase 1 contruction of the Joe Louis Greenway. If you missed it, the city’s presentation is online. This second meeting was similar to the first but did provide additional updates and details — including this timeline.

There is also an online survey which is open through Monday, November 16th.

While Phase 1 contruction is on a former railroad corridor, other parts of the greenway will be on-road. This include Jos Campau. A mile two-way cycletrack was just completed between McNichols and Carpenter (the border with Hamtramck). This segment connects to the railroad corridor near McNichols and will eventually get extended south through Hamtramck.

A similar but shorter on-road design was recently built on Bagley in Corktown. 

The Joe Louis Greenway uses segments of the RiverWalk as well and the Detroit Riverfront Conservancy continues to make progress. The RiverWalk has been extended slightly west of the former Joe Louis Arena site. While the boardwalk in front of the Riverfront Towers is nearly complete, it won’t be opened until the connection to West Riverfront/Ralph C. Wilson Jr. Centennial Park is completed. That connection will be under construction in the spring as will be the nearby May Creek Greenway.  You can read more about these updates, including the new UniRoyal Promenade in the Conservancy’s Fall 2020 newsletter.


MOTION Coalition Mini-Summit

We are members of many advisory committees and task forces, but one that we’ve got much more involved in over the past few years has been the MOTION Coalition at Authority Health. This Coalition focuses on improving public policy to improve health outcomes. Our role has been to promote improvements to the built environment (e.g. Complete Streets, greenways) to increase physical activity and better health.

The Coalition has an annual summit, which is this Tuesday, November 17th starting at 10AM. It’s online and free.

We are moderating the 11:35AM Physical Activity Panel. The panelist include Meagan Elliott PhD, Chief Parks Planner for the City of Detroit, Erika Bocknek, PhD – Wayne State University Family Resilience Lab, and Damon Porter, Detroit Public Schools Community District. We’ll be talking about Detroit parks, greenways, and schools during COVID-19.

Email Dr. Carolyn Custer if you are interested in attending.


Other Updates

  • We co-chair the Detroit City Council Green Task Force committee on Green Transportation and Mobility. We host online monthly meetings to discuss projects and policy related green transportation. Email us if you want to be invited to these meetings. The next one is Tuesday, November 17th at 4pm.
  • State Ballot Proposal 1 passed overwhelmingly earlier this month. Among other things, this removes the budget cap on park/trail development grants and ensures future state gas and mining revenues go towards land conservation and park development.
  • The Ride the Vote event with Council member Scott Benson was a big success. Despite the chilly gray weather, many people came out — and some cast their votes during the ride, too. We had elected officials ride with us, free MoGo bikes, and numerous bike clubs in support. We were on the local news as well. Thanks to all who participated and helped make this event happen. We look forward to doing it again for the next elections, though perhaps during the primaries when the weather is better.
  • We highly recommend that everyone sign up to receive updates for the city’s Streets for People transportation planning effort. That plan’s focus is to “make it easier and safer for all Detroiters to move around the city.” If you want to see changes in the streets near you, this is a great opportunity to begin that discussion.
  • We also recommend taking this quick survey for the city’s new parks and recreation plan. One interesting change with this new plan is it includes greenways!
  • Ford is hosting an online event on Tuesday, November 17th at 6PM to share their vision for Michigan Central, work they’re doing in the community, and their thoughts on what future of mobility might look like. We wouldn’t be surprised if they talked about their connection to the nearby May Creek Greenway. Event Registration

Additional Reading

Categories
Complete Streets Greenways Newsletter Policy Safety & Education

News from the Trail – October 2020

Bike the Vote

Come join us for a group bike ride on Sunday afternoon, October 25th to encourage greater voter participation. We’d love to have a healthy turnout to show that bicyclists are engaged in this year’s election. The weather doesn’t look too bad for late October, either. Masks and social distancing are required!

In addition to supporting this ride, MoGo has a “Roll to the Polls” program that gives riders a free one hour ride to access their polling location or drop off their absentee ballots.  Lisa Nuszkowski, founder and executive director of MoGo says, “Transportation should never be a barrier to voting, and MoGo is proud to join with others in the shared mobility industry to offer free rides on Election Day.”

We continue to endorse Proposal 1 along with more than 30 conservation and environmental groups, including the Michigan Environmental Council, the Michigan Trails and Greenways Alliance, and the Detroit Riverfront Conservancy. The proposal does not change the Trust Fund’s priorities of acquiring and preserving land, which is one reason it’s supported by twelve of the largest land conservancies in Michigan. It also is supported by all of Michigan’s living governors.


Pedestrian Safety Month

We strongly believe that building Complete Streets is the most effective approach for reducing pedestrian (and bicyclist) fatalities. We’ve seen it first hand with improvements to Detroit’s public lighting. Reducing speeding motorists is also a critical issue that can be addressed through Complete Streets, whether it’s more speed humps, lower speed limits, and even bike lanes. 

While the City of Detroit is making new, major investments in speed humps, the speed limit issue is moving more slowly in the state capitol. We discuss these issues and more in our new article, Every Month is Pedestrian Safety Month.


Streets for People

The City of Detroit just launched their Streets for People planning campaign. From the project web page:

The City of Detroit is developing Streets for People, a transportation plan with a singular focus — to make it easier and safer for all Detroiters to move around the city. The plan seeks to knit together diverse neighborhoods, prioritize safety of the most vulnerable road users, and identify clear implementation and design strategies for roadways improvement. Most importantly, it will be rooted in an inclusive planning process that gives a voice to the City’s residents who are most implicated by the transportation system. The plan will be completed over the next two years by the Department of Public Works in partnership with MDOT, SEMCOG, city departments, and partner agencies.

The web page also let’s you sign up for updates and provide some initial thoughts. The plan will be completed in 12 months according to the city’s press release.

Streets for People also has this great introductory video which really frames the pedestrian and bicyclist safety issue to be solved.


Joe Louis Greenway

A second Joe Louis Greenway Design public meeting will be held on October 29th from 6pm to 8pm via Zoom. There is more information about this meeting and how to join it on the city’s Joe Louis Greenway webpage.

If you missed the first public meeting, the presentation is now online and well worth looking over. 

Phase 1 construction continues moving forward. City Council has been asked to approve an MDOT grant request to build a portion of the greenway near Grand River Avenue and Oakman Boulevard. The city has also sold bonds to help with construction as well. They are “aiming to finish Phase I in Fiscal Year 2022.” 


Other Updates

  • Detroit is also updating its Parks and Recreation Plan. They are collecting some initial public input with this online survey. There’s also this interesting article on how COVID could affect this planning. 
  • We’ve been weighing on a number of developments around the city, including the project at the former state fairgrounds involving Amazon. Currently, biking and walking about this area is far from ideal. We submitted comments on how to improve these connections within the development area and with the surrounding neighborhoods, including Ferndale. We also requested bike parking and, if possible, MoGo stations. Our comments seemed to have been addressed by the city and developer.
  • We’ve also been involved in a new proposed warehouse near Conner and Gratiot at the former Cadillac Stamping Plant. Our primary concern was the project’s plan to allow truck traffic to cross the Conner Creek Greenway/Iron Belle Trail at Conner Playfield. It wouldn’t be safe and we expected the trucks would block the greenway as they waited to turn onto Conner. Council member Scott Benson worked with the city and developer to find an alternative truck route that doesn’t cross the greenway.
  • Last month we raised concerns about the city removing unprotected bike lanes during repaving projects, namely the bike lanes on E. Grand Boulevard. DPW followed up and said this was not a city policy. There are proposed plans for adding protected bike lanes on W. Grand Boulevard from Cass to Rosa Parks. We’ll be encouraging the city to continue this design east to replace what was removed.
  • Council President Brenda Jones’ Community Engagement Ordinance passed. It requires many city projects that impact the neighborhoods to have community outreach.The installation of bike lanes was one type of project named in the ordinance. After the E. Grand bike lanes were removed, we proposed that the installation or removal of bike lanes should require community outreach. Council member Benson motioned to add this language to the ordinance and it passed unanamously.
  • The Michigan State Historic Preservation Office launched an online bike tour of Detroit civil rights sites. We were part of the team that helped determine the 17-mile route between the sites. 
  • Lastly, Free Bikes 4 Kids really needs volunteers to help clean and refurbish used kids bicycles to giveaway this year. Please signup for a shift or two and help them get these bikes ready.

Additional Reading

Categories
Greenways Policy

Why We Endorse Proposal 1

  • The Michigan Naturals Resources Trust Fund (MNRTF) is a major funding source for acquiring land for conservation, parks, and trails.
  • The Trust Fund also helps develop parks and trails, though it is currently limited.
  • Proposal 1 maintains the existing grant funding for land acquisitions and increases it for parks and trails. It will also make the redevelopment of existing facilities eligible.
  • Proposal 1 removes the Trust Fund cap, allowing future oil, gas, and mining royalties to be deposited here rather than in the state’s general fund.

Proposal 1 on this November’s ballot makes some changes to the Michigan Natural Resources Trust Fund — and we think they’re all improvements. That’s why we joined the Vote YES on Proposal 1 Coalition along with over 30 other Michigan environment and conservation organizations.

What is the Trust Fund? It’s a dedicated fund that was created from the royalties on oil, gas, and mining operation on state land. It stopped receiving those funds in 2011 when it hit its $500 million cap. However it’s still growing from the interest and investments of those funds. To protect it from being raided for other purposes, voters moved it into the State Constitution (Section 35).

Each year, governments apply for grants from the fund. Those grants are scored, prioritized, then recommended (or not) by the appointed Trust Fund board before being approved by the legislature and governor.

Trust Fund grants have been instrumental for land acquisition and park development in Detroit, including the RiverWalk, Dequindre Cut, May Creek Greenway, Belle Isle, and the DNR Outdoor Adventure Center. Many Detroit parks (e.g. Balduck, Patton, Butzel) have been renovated with these funds as well.

In 2013, we wrote a $3.4 million Trust Fund grant for the City of Detroit that allowed them to purchase the abandoned railroad corridor that will be part of the Joe Louis Greenway.

Ballot proposal impacts

Currently, a maximum of 25% of the available grants funding can be spent on park and trail development grants. The proposal changes this to a minimum of 25%, the same minimum for land acquisition. This analysis from the House Fiscal Agency highlights the benefit in doing this:

Changing the restriction on funds made available for MNRTF-funded development projects from a maximum of 25% to a minimum of 25% would allow the MNRTF Board to recommend, and the legislature to appropriate, more funding for projects than may currently be spent. A total of $86.0 million was made available for project funding in FY 2017-18, and all 34 acquisition applicants received grants totaling $28.9 million. However, only 97 of 121 development applicants received a grant since development awards were capped at $21.5 million (25% of the $86.0 million made available) though development applications totaled $29.0 million. Changing the development project funding ceiling of 25% to a floor of 25% would match the restriction on acquisition projects and provide for all development applications to be appropriated in a given year if recommended by the MNRTF Board.

Legislative Analysis, House Fiscal Agency, December 2018

There have been some misleading claims made that this change reduces land acquisitions, but as the above example, that is simply not the case. All of the recommended land acquisition and park/trail development grants could have been awarded that round. Instead, $7.5 million in funding for parks and trails was not available due to that 25% maximum limit.

We should add that the proposed change is especially beneficial to Detroit where land acquisition is less of a necessity compared to the funding needs for developing parks and trails.

The other major impact is more long term. When the Trust Fund hit its $500 million cap in 2011, oil, gas, and mining royalties started going to the State Parks Endowment. When that endowment hits its $800 million cap (still some years away), those royalties will go to the state’s general fund. If this proposal passes, they’ll go back into the Trust Fund instead, making even more funding available for land acquisition and park/trail development in Michigan.

Based on our in depth review of the ballot language, the current constitutional language, and our experience with the grant program, we see every reason to support ballot proposal 1.

Categories
Complete Streets Greenways Newsletter

News from the Trail – July 2020

Joe Louis Greenway Updates

The City of Detroit announced the Phase 1 construction of the Joe Louis Greenway. This will mostly be on 3-mile section of the former Conrail property between Warren and Fullerton Avenues. Construction is expect to begin in the spring of 2021. The City adds, “Phase 1 will include separate paths for slow and fast users (such as walkers and cyclists) and will provide safe street crossings and neighborhood connections.” Awesome!

For those disappointed that only 3 miles are being built should remember that Phase 1 of the Dequindre Cut was less than a mile. Greenways that require environmental cleanup and are more than just a strip of asphalt or gravel are expensive. This is a fairly good start that will build momentum for further investment.

In the meantime, the City is asking everyone to take this very interesting survey to gather your thoughts and expected uses. The survey will close on August 21st.

The City is hosting an online public meeting on August 13th at 6pm. This meeting is primarily focused on residents in the 48210, 48238, and 48204 ZIP codes as well as Dearborn residents. The City “heard loud and clear” during the Framework meetings that local residents wanted a lead voice in the greenway’s design through their community.


I-94 Project Improvements

New trail bridge over I-94 near Conner AvenueFor more than a decade, we’ve highlighted our concerns about MDOT’s I-94 project through Detroit. When the City and other stakeholders joined in, MDOT listened. They’ve made nearly all of the changes we’d asked for, including fewer service drives, more connections over the freeway, and improved pedestrian crossings. Those changes were just approved by the Federal Highway Administration and are posted online.

MDOT is hosting two online public meetings on August 13th at 9:30AM and 5:30PM to discuss this milestone and provide additional information.

Rendering of new Second Avenue bridgeAs part of the project, MDOT has already removed the Second Avenue bridge over I-94. The new bridge should be open by the fall of 2021. The Cass Bridge will be replaced starting next year. While the Third Avenue bridge was to be removed next year (and not replaced), MDOT is now looking at repurposing this bridge to maintain access in the near term. 

The changes to the I-94 project also include a fully separated trail bridge for the Conner Creek Greenway and Iron Belle Trail. This bridge connects to the existing trail north of Harper Avenue as well as the new Chandler Park trail at Shoemaker. The path will continue south as a two-way cycletrack on Conner Avenue to E. Jefferson.

We brought forward many issues relating to the FCA Expansion and how it affected the Conner Creek Greenway. The Greenway was routed on portions of St. Jean which no longer exist. We were concerned the Conner Avenue bike lanes might go away as well. That is not the case as the State of Michigan recently awarded road funding to improve Conner Avenue near the plant and shift the bike lanes to the eastside of the road. 

“FCA appreciates the coordination of efforts between the City of Detroit and MDOT to secure funding for local road improvements that will support the addition of 5,000 new jobs at our Mack and Jefferson North Assembly plants,” said Marc Brazeau, head of Logistics – North America, Fiat Chrysler Automobiles. “We are equally pleased that these improvements will benefit local residents and businesses, as accommodations will be made for bicyclists and pedestrian access to local core services and recreational facilities.”    

Proposed cross section of Conner Avenue near the FCA plant

Complete Streets and COVID

Sidewalk-level bike lanes on Livernois are nearly completeThe Detroit Department of Public Works (DPW) has been continuing their Complete Streets projects, working on a transportation master plan called “Streets for People”, and responding to the COVID pandemic. Caitlin Malloy-Marcon, Deputy Director of Complete Streets recently presented updates during a recent Green Task Force Transportation and Mobility committee. 

The Complete Streets projects will mostly be completed this year. This includes Grand River (and the Grand Parklet), Livernois, Riopelle (in Eastern Market), Jos Campau, Conant, Kercheval, W. McNichols, and Rosa Parks (from W. Grand Boulevard to Clairmont). East and West Warren are slated for 2021, but require additional community engagement. 

Complete Streets are more important than ever. With fewer vehicles on the roads, increased speeding has been reported. Detroit residents also continue to request speed humps to reduce speeding in residential areas. There are now 6,000 speed hump requests in the queue. This is far more than the city has funding for so they are prioritizing locations near schools and parks.

The “Streets for People” planning is underway though they are largely doing data collection at this time while trying to determine how to best enage the public during the pandemic. They have found that 40% of all reported collisions occur on just 3% of city streets. They have also developed educational materials. We’ll certainly share more information about this project as it progresses.

Streets for People plan

Lastly, DPW has been responding to the pandemic by making it easier for businesses to offer outdoor dining within public right-of-ways, i.e. sidewalks, alleys, and roads. They’ve streamlined the permitting processes, and where requested, closed some roads to vehicle traffic. It’s been a “great success” though most of the requests have been in the downtown area. They are also looking to pursue similar efforts that would open right-of-ways for outdoor retail as well as recreation near schools, especially since some gyms may be repurposed as classrooms. 


Robots on Sidewalks

FedEx delivery robotAmazon and FedEx want automated delivery devices as a last-mile solution for delivering packages. They have been working with legislators to change state law and allow autonomous half-ton, motorized vehicles on all Michigan sidewalks operating at 10 MPH — and grant them all the rights pedestrians.

What could possibly go wrong?

From the start, we’ve been leading on this issue, creating an analysis of how other states regulate these, and highlighting issues with the proposed language. We’ve focused on protecting existing pedestrian access (including those with disabilities), while keeping them out of bike lanes and trails. Perhaps most importantly, we’ve asked for local control so cities like Detroit have the flexibility to manage these new devices and preserve a walkable environment. Council member Scott Benson introduced a resolution (later passed by Council) that also asked for local control.

The legislation (SB 892) passed out of committee with Senator Adam Hollier (D-Detroit) opposed. It did include some of what we asked for, including a prohibition on trails. It doesn’t specifically allow them in bike lanes. The local control is extremely limited. It also allows any individual to operate these devices and for reasons other than delivery. On a positive note, it does include improved pedestrian crosswalk provisions which we strongly support.

We’ll continue working with others, including the Michigan Municipal League and Detroit City Council to try influencing legislators to pass a bill that doesn’t prioritize the delivery business over walkability.


Other Updates

  • Bike lane maintenance. Maintenance has been reduced during the pandemic, but it’s starting to improve. However, given expected cuts in future state road funding (from decreases in fuel sales), DPW is making adjustments. Their updated maintenance plan should be released soon. One bright spot: their new bike lane mini-sweepers are being tested and should make it much easier to sweep and vacuum the bike lanes.
  • Greenway maintenance. With grant funding from the Community Foundation for Southeast Michigan, we’ve been able to contract the Greening of Detroit to do maintenance work and tree plantings along greenways. We’re also using this funding to make repairs and improve the automated bicyclist and pedestrian counters on both the Dequindre Cut and Cass Ave.
  • Michigan Trails Publication. You may have seen the high-quality printed magazine called Michigan Trails at your local bike shop. You may have noticed in recent issues that Detroit trails were excluded. We worked with the Michigan Trails and Greenways Alliance — a major sponsor of the publication — to get the Detroit trails re-added. The Michigan Trails website now links to our new Detroit trails page with a map, photos, and destination highlights aimed more at those unfamiliar with what’s happening in Detroit. 
  • I-375 Alternatives. We were concerned about MDOT’s proposal to delay construction funding for this project until 2027. The project would greatly improve walking and biking along the entire eastside of downtown, including connections into Eastern Market. It would also allow significant green stormwater management handling runoff the many large roads and paved parking lots in this area. This month the SEMCOG Transportation Coordinating Council rejected MDOT’s request. The local press has now picked up on the story. We’re continuing to advocate for this project happening sooner. We believe the full story has not yet been revealed.
  • Detroit Bikes. For its 125th anniversary, Schwinn is collaborating with Detroit Bikes on a limited-edition cruiser inspired by the 1965 Schwinn Collegiate Deluxe. Detroit Bikes is now producing upwards of 10,000 bike per year in the city.
  • Erb Family Foundation. We want to thank the Erb Family Foundation for their continued support of the Detroit Greenways Coalition and our efforts to get green stormwater infrastructure routinely included in all park, greenways, and Complete Streets projects. 
Categories
Complete Streets Greenways Newsletter

News from the Trail – June 2020

Unity Ride 4 Justice

We want to thank the Detroit Saints Bike Club for hosting the Unity Ride 4 Justice ride last week. It was inspiring, uplifting, and positive event that reinforced that we are all one family and supporting each other when we ride together.


Virtual Project Meetings

Given the panademic, all public project meetings are now online. Here are some June meetings you may want to check out and provide feedback — 

  • State Long-range Transportation Plan on June 16th at 7 PM and June 17th at 10 AM – Want to help shape how the state of Michigan invests in transportation? MDOT is hosting two telephone town halls to get your input. You must register 3 hours in advance. There’s more information online for this statewide planning project. 
  • Old Redford Neighborhood Link on June 17th at 5:30 PM – This meeting is for sharing your thoughts on community-led activation of public space in Old Redford. This includes public art and cultural programming. Zoom or call in 312 626-6799 with meeting ID 528 771 3400.
  • Parkland Park on June 18th – Wayne County Parks is hosting two public meetings to discuss improvements at Parkland Park in Dearborn Heights, neslted between Rouge Park and Hines Drive: 11 AM – 12 PM (password 630206) and 4 PM – 5 PM (password 003784). The park provides a key connection for the Rouge River Greenway. Please consider joining one of these meetings!
  • Kercheval Streetscape on June 18th from 5:30 PM – The City of Detroit is hosting this meeting to give contruction updates. This project runs from E. Grand Boulevard to Parker and includes improvements for walking and biking. Zoom or call 231 338-8477.
  • Lenox Center/A.B. Ford Park on June 30th at 5:30 PM – The City of Detroit is having a kickoff community meeting for a redesigning project. Zoom, or call  267-831-0333 with meeting ID: 918 1582 7787. They are also gathering input using this survey.

Other Updates

  • Joseph Campau in Detroit is being resurfaced between E. Davison and Carpenter this year. It will be receiving a two-way cycletrack as well since this is a segment of the Joe Louis Greenway.
  • The City of Detroit received the entry-level Bicycle Friendly Community award from the League of American Bicyclists. Like other national awards, it assumes the Census Bureau’s bike to work numbers accurately reflect the amount of bicycling in all cities. That’s not a good assumption in Detroit where bicycling is growing ever popular while its bike to work numbers have dropped significantly.
  • Similarly, People for Bikes ranked Detroit as 22nd among U.S. cities, jumping over a couple hundred other municipalities. Last year Detroit fell over 100 spots in the rankings despite adding more protected bike lane miles than any U.S. city. We don’t place much value in this either since it also makes assumptions with Census data.
  • The planned overhaul of the Detroit zoning ordinances continues, this includes possibly reducing or eliminating parking requirements — something that could lead to denser development that is more walkable and bikeable. We would welcome this.
  • The Detroit Riverfront Conservancy, Eastern Market, Belle Isle Conservancy, Downtown Detroit Partnership and City of Detroit have developed this Detroit Parks Coloring Book. Download the pages for free and start coloring!

Livernois Bike Shop

We want to extend our condolences to the family and friends of Sam Awada, owner of the Livernois Bike Shop, located at the east end of the new Fitzgerald Greenway. Sam’s family says the shop will continue to be open and honor his memory. 

A memorial gathering occured shortly after his passing where many in the community shared their stories of how Sam helped them and others. His nephew mentioned Sam’s adoration of MLK Jr. and how he would play his speeches as the younger kids sat on the floor and listened. Read more about Sam and the shop